Weekly Progress Updates 2.17.23
- agertz
- Feb 17, 2023
- 2 min read
The office will be closed this weekend, 2/18-2/19. There will be a new employee entrance starting February 20. The west entrance will no longer be available for entry into the building or deliveries. This will allow renovation of the west half of the first-floor lobby.
NO CARS WILL BE ALLOWED IN THE PARKING LOT THIS SATURDAY, 2/18.
This Week
Millwork was started
Installation of interior demountable partitions started
Exterior metal panels started
Wood floor installation started on the second floor
Preparation for relocation of employee entrance
Installation of doors and hardware started
This weekend – New Employee Entrance
The purpose of this new configuration is to allow the construction team to begin work on the west half of the first floor and finish the lobby.
The security system will remain active and key fabs will work in the same fashion.
Guests will be able to ring the doorbell and be buzzed into the building by reception on the 3rd floor.
Deliveries/outgoing packages like FedEx and UPS will be utilizing a container (package station). They will be buzzed in, and packages will be left/picked up from the container inside the door.

Next Week
Start West Lobby demolition.
Mechanical layout
Mechanical tie-ins to the new condensing units
Continuing installation of wood flooring
Starting installation of stair treads and risers
Continuing with demountable partition installation
General reminders
During construction, parking spaces have been assigned. Please ensure that you use only your spot or park offsite.
Visitors will not be able to park in the lot and visiting employees should be prepared to find remote parking. Double parking will not be permitted.
Emergency issues related to the 643 renovations should be routed to Jack Brown at 847-338-4308.
All general building maintenance/engineering issues should still be sent to Tom Brannon at 847-609-7893.